O Ten

Premium Mixed-Use Tower · Dubai Healthcare City, Dubai

Project Type
Mixed
Use Tower
Floors
2B+G+10+Roof
Status
Completed

Project Overview

O Ten is a striking mixed-use tower situated in the prestigious Dubai Healthcare City (DHCC) free zone. The building comprises 2 Basement levels, a Ground floor, 10 typical floors, and a Roof level — delivering modern commercial and residential spaces within one of Dubai's most sought-after healthcare and wellness districts. Sescon Star Electromechanical Works LLC was entrusted with the complete MEP (Mechanical, Electrical & Plumbing) engineering scope, delivering fully integrated HVAC, electrical power distribution, plumbing, fire fighting, and ELV systems engineered for optimal performance and regulatory compliance. The project was executed under the consultancy of Barajeel Engineering Consultant, ensuring adherence to DHCC and Dubai Municipality codes. Developed by M/AVQAA Properties, O Ten represents a landmark addition to the Dubai Healthcare City skyline.

13
Total Levels
2
Basement Levels
10
Typical Floors
100%
MEP Scope

Project Gallery

Discover the architectural vision and engineering excellence of O Ten

O Ten Exterior
Architectural Marvel

O Ten Tower

O Ten Interior
Premium Spaces

Modern Interiors

MEP Systems

Centralized HVAC with VRF technology and fresh air handling units

Engineered & installed by Sescon Star

Complete MV/LV electrical distribution with intelligent load management

Engineered & installed by Sescon Star

Advanced plumbing systems with hot/cold water, drainage and sewage

Engineered & installed by Sescon Star

Addressable fire alarm and suppression systems (sprinklers & wet risers)

Engineered & installed by Sescon Star

ELV systems: CCTV, access control, intercom, SMATV, structured cabling

Engineered & installed by Sescon Star

BMS integration for centralized building monitoring and control

Engineered & installed by Sescon Star

LED lighting with automated dimming and daylight harvesting

Engineered & installed by Sescon Star

Basement ventilation with jet fans and CO detection

Engineered & installed by Sescon Star

Pressurization systems for stairwells and lobbies

Engineered & installed by Sescon Star

Generator and UPS backup power systems

Engineered & installed by Sescon Star

Lightning protection and earthing systems

Engineered & installed by Sescon Star

Water tanks, booster pumps and drainage infrastructure

Engineered & installed by Sescon Star

System Breakdown

HVAC — Variable Refrigerant Flow (VRF) + Fresh Air Handling Units

Designed, supplied & installed by Sescon Star Electromechanical Works LLC

Electrical — MV/LV switchgear, genset, UPS, lightning protection

Designed, supplied & installed by Sescon Star Electromechanical Works LLC

Plumbing — Hot/cold water, drainage, sewage, water tanks & pumps

Designed, supplied & installed by Sescon Star Electromechanical Works LLC

Fire Fighting — Sprinklers, hose reels, wet risers, fire alarm panel

Designed, supplied & installed by Sescon Star Electromechanical Works LLC

ELV — CCTV, access control, intercom, SMATV, structured cabling

Designed, supplied & installed by Sescon Star Electromechanical Works LLC

BMS — Full building automation and energy monitoring

Designed, supplied & installed by Sescon Star Electromechanical Works LLC

Project Highlights

1

2B + G + 10 Floors + Roof configuration

A key feature that sets O Ten apart in Dubai Healthcare City.

2

Complete MEP engineering by Sescon Star

A key feature that sets O Ten apart in Dubai Healthcare City.

3

Barajeel Engineering Consultant oversight

A key feature that sets O Ten apart in Dubai Healthcare City.

4

Smart HVAC with energy-efficient VRF systems

A key feature that sets O Ten apart in Dubai Healthcare City.

5

Advanced fire fighting & life safety systems

A key feature that sets O Ten apart in Dubai Healthcare City.

6

Full ELV and BMS integration

A key feature that sets O Ten apart in Dubai Healthcare City.

Specifications

Project Name
O Ten
Configuration
2 Basements + G + 10 Floors + Roof
Location
Dubai Healthcare City, Dubai, UAE
Client
M/AVQAA Properties
Consultant
Barajeel Engineering Consultant
MEP Contractor
Sescon Star Electromechanical Works LLC
Status
Completed 2024

Location Benefits

Prime location in Dubai Healthcare City (DHCC) free zone
Adjacent to world-class hospitals and medical centres
Easy access to Al Khail Road and Sheikh Zayed Road
Close to Dubai Creek and cultural districts
Walking distance to cafés, retail and wellness facilities
Excellent connectivity via Dubai Metro

Interested?

Looking for a trusted MEP contractor for your next project? Let's talk.

Get a Quote

Project Timeline

Planning & Design Q2 2022
Construction Start Q4 2022
MEP Installation Q2 2023
Testing & Commissioning Q2 2024
Handover Q3 2024
View All Projects

Engineering Excellence

13
Total Levels
6
MEP Disciplines
100%
On-Time Delivery
A+
Quality Rating

MEP Excellence

Every MEP system at O Ten is engineered for maximum efficiency, occupant comfort, and long-term reliability. From intelligent HVAC controls to advanced fire safety, Sescon Star delivered a fully integrated building services package in the heart of Dubai Healthcare City.

Code Compliance

Full DHCC, DCD & Civil Defence approvals

Energy Efficiency

Optimised systems exceeding Al Sa'fat requirements

Quality Assurance

ISO 9001:2015 certified processes

O Ten MEP Systems
A+
Quality Rating